What is PERT and CPM?

This is a discussion on What is PERT and CPM? within the PPC, CPA, CPM, CPV, etc forums, part of the Internet Marketing category; What is PERT and CPM?...

  1. #1
    Junior Member Crashedbeats's Avatar
    Join Date
    Feb 2018
    Location
    Delhi, 110001, India
    Posts
    29

    Default What is PERT and CPM?

    What is PERT and CPM?

  2. #2
    Senior Member
    Join Date
    Oct 2017
    Posts
    192

    Default Re: What is PERT and CPM?

    CPM (Critical Path Method) is used to assist the project manager in scheduling the activities (i.e., when should each activity start). It assumes that activity durations are known with certainty.
    PERT (Program Evaluation and Review Technique) is used to assist in project scheduling similar to CPM.

  3. #3
    Junior Member
    Join Date
    Mar 2018
    Posts
    12

    Default Re: What is PERT and CPM?

    CPM is a technique that is used in projects that have predictable activities and tasks such as in construction projects. It allows project planners to decide which aspect of the project to reduce or increase when a trade-off is needed. It is a deterministic tool and provides an estimate of the cost and the amount of time to spend in order to complete the project. It allows planners to control both the time and cost of the project.
    PERT, on the other hand, is used in projects that have unpredictable tasks and activities such as in research and development projects. It utilizes three estimates of the time to complete the project: the most probable, the most promising, and the most unfavorable.
    It is a probabilistic tool using several estimates to determine the timely completion of the project and to control the activities involved in the project so that it will be completed faster and at a lower cost.

    Cheers!!
    Emily

  4. #4
    Senior Member
    Join Date
    Jan 2018
    Location
    PUNE
    Posts
    281

    Default Re: What is PERT and CPM?

    PERT and CPM are the two network-based project management techniques, which exhibit the flow and sequence of the activities and events. Program (Project) Management and Review Technique (PERT) is appropriate for the projects where the time needed to complete different activities ...

  5. #5
    Senior Member RH-Calvin's Avatar
    Join Date
    Jun 2013
    Posts
    3,603

    Default Re: What is PERT and CPM?

    PERT is a project management technique, used to manage uncertain activities of a project. CPM is a statistical technique of project management that manages well defined activities of a project. A technique of planning and control of time.
    Cheap VPS | $1 VPS Hosting | Windows with Remote Desktop
    Cheap Dedicated Server | $29 Dedicated Server with Free IPMI Setup

  6. #6
    Member
    Join Date
    May 2020
    Posts
    60

    Default Re: What is PERT and CPM?

    CPM is a statistical technique of project management in which planning, scheduling, organising, coordination and control of well-defined activities take place. PERT is a technique of planning and control of time. Unlike CPM, which is a method to control costs and time. A deterministic model is used in CPM.